Save With Flooding Rebates
AquaRescue

Halton Basement Flooding Subsidy

Oakville, Burlington, Milton, and Halton Hills share Halton's subsidy. Disconnection work is covered up to 100%. A backwater valve is 50%.

Halton Region subsidizes flood-protection work on homes connected to its wastewater system. For work completed after July 15, 2024, disconnection work is covered at 100% up to a set limit, and a backwater valve or lateral repair is covered at 50%. There is no single combined maximum. Each item has its own cap, and each subsidy is once per property.

Covers Oakville, Burlington, Milton, and Halton Hills.

Each item has its own cap

These amounts do not add up to one program maximum. A home can qualify for more than one, if the work and the paperwork match that item.

  • Weeping tile and sump pump$6,500
  • Exterior storm drain$6,500
  • Downspout disconnection$900
  • Backwater valve50% up to $1,600
  • Wastewater lateral repair50% up to $4,000
Eligible workShareMaximum the Region pays
Weeping tile and sump pumpUp to the maximum$6,500
Exterior storm drainUp to the maximum$6,500
Downspout disconnectionUp to the maximum$900
Backwater valve50%$1,600
Wastewater lateral repair50%$4,000

Planning figure

Your subsidy receipt

You pay the invoice first. Halton pays you after it approves the application. This is not taken off our bill.

Region pays youUp to $8,100

You pay firstAdd invoice amounts

Each selected line uses that item's own percentage, up to its own cap. Halton does not publish one combined maximum. Leave an invoice blank to see the cap.

Who can apply

  • The home is in Oakville, Burlington, Milton, or Halton Hills and is connected to Halton's municipal wastewater system. A septic home is not eligible.
  • Apply within one year of finishing the work.
  • A Household Drainage Survey, or a licensed plumber's assessment, confirms the connection the subsidy is for.
  • Where the local town requires a permit, that permit has passed final inspection.
  • Each of these subsidies is available once per property, even if the owner changes.

In Burlington, the City also does not charge the building permit fee for a backwater valve, for a sump pump installed with a backwater valve, or for a sanitary line repair. That is a fee waiver, not an extra cash rebate.

basementfloodingsubsidy@halton.ca

How we handle the paperwork

  1. 1

    We confirm the connection

    Halton wants proof the weeping tile, drain, or downspout was actually tied to the wastewater system. A plumber's assessment can be included in the eligible costs, inside the existing cap.

  2. 2

    The local permit, where one is required

    Oakville, Burlington, Milton, or Halton Hills inspects the work. We leave it open until that inspection passes.

  3. 3

    Application and waiver

    You send the signed forms, a paid itemized invoice, and the before-and-after photos or camera footage to basementfloodingsubsidy@halton.ca. Halton mails a cheque 4 to 6 weeks after a complete application.

Questions about this program

Amounts were checked against the Halton Region Basement Flooding Prevention Subsidy Program on October 5, 2026. Each amount is on that item's own Halton page. Work completed after July 15, 2024 uses the caps above. Burlington permit fee grant.

Get a FREE Estimate

AquaRescue © 2026 Website by HOMESHOWOFF